Copper | Havilah Resources | Mining | South Australia
top of page
288165_2200-1200x628.jpg

 1.3 MILLION TONNE RESOURCE

Low Sovereign Risk, Mining Friendly South Australia

COPPER

auMap.png

OUR FLAGSHIP

COPPER PROJECTS

  • 1.3 million tonnes of copper in JORC Mineral Resources contained in two advanced projects, namely Kalkaroo and Mutooroo.
     

  • Excellent logistics, being located in northeastern South Australia near Broken Hill with the Transcontinental railway and main highway nearby.
     

  • An ethical source of copper from a low sovereign risk, tier 1 environmental, social and governance (ESG) destination. 

​​

  • BHP (previously OZ Minerals) has recently completed a comprehensive Study Program on the Kalkaroo deposit that found no fatal flaws​​. The resulting financial model confirms a robust long-life project with favourable development prospects.​

​

CLICK HERE TO VIEW THE COPPER PRESENTATION

2.png
7.png

KALKAROO

– One of the larger undeveloped open pit copper deposits in Australia.

​

- Contains 1.1 million tonnes of copper, 3.1 million ounces of gold and 23,200 tonnes of cobalt in Measured, Indicated and Inferred JORC Mineral Resources.

​

- Project is well advanced with granted mining lease, native title agreement, earlier PFS, and land ownership.

​

- BHP (previously OZ Minerals) has recently completed a comprehensive Study Program on the Kalkaroo deposit that found no fatal flaws and highlighted:

  • The reliability of Havilah’s resource drilling and resource block model.

  • Material improvements in copper recovery and copper concentrate grade for the chalcopyrite-pyrite sulphide ore.

  • New open pit optimisations and mining schedules which potentially extends the open pit mine life to more than 20 years. 

  • A financial model that confirms a robust long-life project with favourable development prospects. 

​

- Curnamona Province Strategic Alliance regional exploration drilling targeted a province wide copper-gold exploration play, highlighting four multi-commodity prospects within 15 km of Kalkaroo with the scale to potentially generate new Kalkaroo size discoveries.

​

Kalkaroo

MUTOOROO

– One of the higher grade sulphide cobalt deposits (0.16% cobalt) in Australia with associated copper (1.53% copper).

​

- Contains 195,000 tonnes copper, 20,200 tonnes of cobalt and 82,100 ounces of gold in Measured, Indicated and Inferred JORC resources.

​

- Concept is for an initial shallow open pit exploiting >1.3% Cu and 0.14% Co Measured and Indicated resources followed by underground mining of higher grade Inferred resources >1.7% Cu and 0.17% Co.

​

- Good exploration potential for new discoveries in the surrounding 100% owned exploration licences confirmed by the 2023 drilling program.

3 2.png
4.png
Mutooroo

COPPER MINING FEASIBILITY STUDY STEPS

Where Havilah's advanced copper projects sits.

CORPORATE PORTFOLIO

5

Projects

Tonnes of Copper

1.3M

Ounces of Gold

3.2M

451M

Tonnes of Iron Ore

43.4k

Tonnes of Cobalt

KEY ASSETS

  • Copper, gold, cobalt JORC Mineral Resource inventory – 1.3 million tonnes of copper, 3.2 million ounces of gold and 43.4 thousand tonnes of cobalt.

  • Kalkaroo copper-gold-cobalt deposit – 100 million tonne open pit JORC Ore Reserves of 0.474 million tonnes of copper and 1.4 million ounces of gold.

  • Mutooroo copper-cobalt-gold deposit – 13.1 million tonnes of 1.53% copper, 0.16% cobalt and 0.20 g/t gold open pit massive sulphide deposit.

  • Iron ore – three deposits namely Maldorky and Grants JORC Resources and Grants Basin, with potentially several billion tonnes of iron ore mineralisation.

  • Over 11,000 km² of highly prospective mineral tenements in South Australia – unmatched elsewhere in Australia.

​

*Note that not all announcements are posted on this website. Click here to see all announcements on ASX

*Items shown in photographs on this website may not necessarily be assets of Havilah Resources. 

HAVIAH_CAMP-17_edited.jpg
ANNUAL REPORT 2023
HAVIAH_CAMP-13.jpg
Technical Review AGM 2023
HAVIAH_CAMP-5.jpg
QUARTERLY ACTIVITIES
REPORT & CASH FLOW REPORT 
 
- PERIOD ENDED
31st January 2024
Contact
bottom of page